1. Installation
1-1 Refrigerant Refill Procedure
If connecting pipe of more than 5 metres is installed, additional refrigerant should be charged by extra metre. You don’t have to charge additional refrigerant up to 5 metres of connecting pipe.
1. | Remove the valve stem cap and service port of | |
| valve. | |
|
|
|
|
|
|
|
|
|
|
|
|
2. | Connect the charging hose of low pressure side of | |
| Manifold gauge to the packed valve having a charging | |
| port(1/2” Packed valve) as shown at the right figure. | |
|
|
|
• Piping length and the height
|
|
| Pipe Size | Max.piping | Max | ||
|
|
| length | height | |||
|
|
|
|
| |||
|
|
| LIQUID | GAS | A | B | |
AD26B1C13 | 1/4” | 1/2” | 15m(49ft 3in) | 7m(23ft) | |||
1/4” | 1/2” | 15m(49ft 3in) | 7m(23ft) | ||||
| |||||||
AD18B1C09 | 1/4” | 3/8” | 15m(49ft 3in) | 7m(23ft) | |||
1/4” | 3/8” | 15m(49ft 3in) | 7m(23ft) | ||||
| |||||||
|
|
|
|
|
|
|
3. | Operate the unit at the cooling mode. | |
|
|
|
|
|
|
|
|
|
|
|
|
4. | Slowly open the valve of the low pressure side of | |
| Manifold gauge counterclockwise until the low pressure | |
| of manifold gauge indicates 4.8 to 5.5 kg/cm2 (68 a | |
| 78psi) at the high cool operation | |
| the standard temperature. | |
| It is recommend that refrigerant should be slowly put in. | |
| If the refrigerant is put in too quickly, compressor will be | |
| damaged. | |
|
|
|
|
|
|
|
|
|
|
|
|
5. | Stop operation of the air conditioner. | |
|
|
|
Additional refrigerant charge (R22,g)
•When length of the pipe is over 5u by the unit, you should charge
the refrigerant Formulas
pipe Lb:the length of
INDOOR UNIT
A
B
OUTDOOR UNIT
6. | Disconnect the charge hose of manifold gauge. |
7. | Close the cap of each valve. |
INDOOR
INDOOR
1