Sears N9MP2, N9MP1, 9MPD Arerequiredtocompletetheinstallation, Concentric Vent Roof Installation

Models: 9MPD N9MP1 N9MP2

1 62
Download 62 pages 59.01 Kb
Page 45
Image 45

VerticalterminationispreferredFieldsuppliedpipeandfittings. {t

:::i ;{i {}}i{

 

 

arerequiredtocompletetheinstallation.

 

Concentric

Vent Dimensional

 

 

 

 

Drawing

 

 

 

Kit Components

 

BPVC

 

 

Kit Contents:

 

 

 

 

 

3" Rain Cap or 2" Rain Cap

 

\Ven

haustI

 

3;;DiameterSDR-26

Pipe, 191/2;;Long or

13/16"

 

4

DiameterSDR-26

Pipe,371/8, Long,

 

 

 

 

2

DiameterSDR-26

Pipe,315/8 Long or

 

 

 

 

21/2"DiameterSDR-26 Pipe, 24" Long,

 

3" Y Concentric Fittingor 2" Y ConcentricFitting

 

3"or 4"Dia.

11/2"

SDR-26Pipe

25-22-03

2" or3" Dia.

2 or 21/2"Dia.

2" or3" Dia.

RainCap

¥ ConcentricFitting

SDR-26Pipe

 

 

 

25-22-03

Vertical & Horizontal Termination

1.Determine the pipe diameters required for the installation from Table 10 and Table 11 and Figure 46.

2.Determine the best location for the termination kit. See

Figure45 for vertical termination or Figure 45 and

Figure 49 for horizontal termination. Roof termination is preferred since it is less susceptible to damage, has re-

duced intake contaminants and less visible vent vapor. For

side wall termination, consideration should be given to: 1)

possible damage from the vapors to plants/shrubs, other equipment and building materials, 2) possible damage to the terminal from foreign objects, 3) wind effects that may

cause recirculation of flue products, debris or light snow and 4) visible vent vapor.

3.Cut one 5" diameter hole through the structure for the

NAHA001CV Kit or one 4" diameter hole for the

NAHA002CV Kit.

4.Dimension D may be lengthened to 60" max. or shortened by cutting the pipes to 12" min. Dimension A will change ac-

cording to D dimension. (See Figure 46)

Concentric Vent Roof Installation

Vent /_ Maintain12" min.clearanceabove

_Y highestanticipatedsnowlevel.Max. of24"aboveroof.

Combustion

Air

Roof Boot/

Flashing

Support

(Field Supplied)

(Field Supplied)

Vent

Combustion

Air 25-22-02

Note:

SUDDort must be field installed to secure termination kit to structure.

//

ModelA*BCD**

NAHAO01CV 38z/8341/2 211/8

NAHAOO2CV 33s/8231/2 16//8

=Dimension will change accordingly as dimension D is lengthened or shortened.

_ = Dimension D may be lengthened to 60" may also be

shortened by cutting the pipes provided in the kit to 12" minimum

i ' ;: ;Concentric Termination Kit

_bI_ 0 , NAHA001CV & NAHA002CV Venting Table for *9MPD Models

50,000, 75,000 & 80,000 Btuh Furnaces

NAHAOO2CV - 35'& (4) 90 ° elbows with 2" PVC pipe or NAHAOOICV - 65'& (4) 90 ° elbows with 3" PVC pipe

100,000 Btuh Furnace

NAHAOOICV - 35'& (4) 90 ° elbows with 3" PVC pipe or NAHAOOICV - 65'& (4) 90 ° elbows with 3" PVC pipe & Long Vent Kit (See Tech. Manual)

125,000 Btuh Furnace

NAHAOOICV - 35' & (4) 90 ° elbows with 3" PVC pipe

1.Do not include the field supplied 45 ° elbow in the total elbow count,

2.If more than four elbows are required, reduce the length of both the inlet and the exhaust pipes five feet for each

additional elbow used.

3, Elbows are DWV long radius type for 2" and 3" vents,

NOTE: Feet of pipe is whichever pipe run is the longest, either inlet or outlet side,

44001 111400

[_

Page 45
Image 45
Sears N9MP2, N9MP1, 9MPD manual Arerequiredtocompletetheinstallation, Concentric Vent Roof Installation