Sears N9MP2 Horizontal Termination, Proper Sealing Procedure for Combustion Blower, Vent Pipe

Models: 9MPD N9MP1 N9MP2

1 62
Download 62 pages 59.01 Kb
Page 27
Image 27

Proper Sealing Procedure for

Combustion Blower

RubberCoupling

J

._

VentPipe

 

& Clamps--__ ____

_

_

(Top Panel

Exit)

tPipe

_

NOTE: The

90 ° elbow is ap-

 

 

proved for use inside the furnace

 

 

ONLY.

Vent Fitting

 

 

 

 

90° Elbow

 

 

&Clamps

Combustion

Blower

Vent Extension _'_.

Pipe (Side Panel

Exit)

DRAIN SIDE VIEW

_/_'ia

t e downward

NOIF. guilt-inchannelwill

25-24-14

beangled5° to 10° also.

Joining Pipe and Fittings

FIRE HAZARD

Observe all cautions and warnings printed on material

containers to prevent possible death, personal injury

and/or property damage.

Provide adequate ventilation and do NOT assemble near heat source or open flame. Do NOT smoke while using solvent cements and avoid contact with skin or eyes.

This furnace is approved for venting with Schedule 40 PVC, CPVC, ABS, Cellular Core pipe fittings and SDR-26 PVC.

NOTE: All PVC, CPVC, ABS, and Cellular Core pipe fittings, sol- vent cement, primers and procedures MUST conform to Ameri- can National Standard Institute and American Society for Testing and Materials (ANSI/ASTM) standards.

Pipe and Fittings - ASTM D1785, D2241, D2466, D2661, D2665, F-891, F-628

PVC Primer and 5olvent Cement- ASTM D2564

Procedure for Cementing Joints - Ref ASTM D2855

NOTE: In order to create a seal that allows future removal of pipe, RTV sealant MUST be used on the inlet pipe where it joins to the furnace. PVC, CPVC, ABS, and Cellular Core pipe and ce- ment may be used on all other joints.

CAUTION

Do NOT use solvent cement that has become curdled, lumpy

or thickened and do NOT thin. Observe precautions printed

on containers. For applications below 32 ° F., use only low

temperature type solvent cement.

1.Cut pipe end square, remove ragged edges and burrs. Chamfer end of pipe, then clean fitting, socket and pipe

joint of all dirt, grease, or moisture.

NOTE: Stir the solvent cement frequently while using. Use a natu- ral bristle brush or the dauber supplied with the cement. The prop- er brush size is one inch.

2.After checking pipe and socket for proper fit, wipe socket

and pipe with cleaner-primer. Apply a liberal coat of primer to inside surface of socket and outside of pipe. Do NOT al- low primer to dry before applying cement.

3.Apply a thin coat of cement evenly in the socket. Quickly apply a heavy coat of cement to the pipe end and insert pipe into fittings with a slight twisting movement until it bot- toms out.

NOTE: Cement MUST be fluid while inserting pipe. If NOT, recoat pipe.

4.Hold the pipe in the fitting for 30 seconds to prevent the ta- pered socket from pushing the pipe out of the fitting.

5.Wipe all excess cement from the joint with a rag. Allow 15 minutes before handling. Cure time varies according to fit,

temperature and humidity.

Connecting Vent Pipes and Termination

NOTE: Combustion air intake and vent MUST terminate in the

same atmospheric pressure zone. If installation is in a cold cli-

mate (sustained temperatures below 0 °F), increase the minimum distance between vent pipe and air intake from 8" to 18".

CAUTION

Maintain a minimum of 36" between combustion air inlet and

clothes dryer vent. Terminate the combustion air intake as

far as possible from any air conditioner, heat pump,

swimming pool, swimming pool pumping, chlorinator or

filtration unit.

Install all couplings, nipples and elbows using proper pro- cedures for Joining Pipe and Fittings and maintain spac-

ing between vent and combustion air piping as indicated in Figure 19 through Figure 27.

Sidewall Termination 12" or More

Above Snow Level or Grade Level

MIN.

_18" Minimum

for cold

climates

 

(substained

below

0° F)

Horizontal Termination

Cuttwoholes.

2 /2' for 2"pipe,

3" for 2 1/2' , pipe, or3 1/2' , for

3" pipe. Do NOT make the holes oversized, or it will be nec- essary to add a sheet metal or plywood plate on the outside with the correct size hole in it.

44001 111400

I_

Page 27
Image 27
Sears N9MP2, N9MP1, 9MPD manual Horizontal Termination, Proper Sealing Procedure for Combustion Blower, Vent Pipe

9MPD, N9MP1, N9MP2 specifications

The Sears N9MP2, N9MP1, and 9MPD are prominent models in the realm of residential heating systems, specifically designed to provide efficient and effective heating solutions. These models are part of Sears' commitment to quality and innovation, making them a popular choice among homeowners seeking reliability and performance.

The N9MP2 is a high-efficiency multi-speed gas furnace that boasts an impressive AFUE (Annual Fuel Utilization Efficiency) rating. This feature allows the furnace to convert a significant portion of fuel into usable heat, which effectively translates to lower energy bills for homeowners. The unit is equipped with a two-stage gas valve that provides increased comfort by adjusting the heating output based on demand, ensuring an even temperature throughout the home.

The N9MP1, like its counterpart, is known for its reliability and efficiency. It offers a single-stage operation that is ideal for homes needing consistent heating without the necessity for the more complex stages present in two-stage systems. This model also has a good AFUE rating, making it a cost-effective solution for families looking to reduce their heating expenses. Its design is tailored for easy installation and maintenance, allowing homeowners to keep their heating systems running at optimal performance without hassle.

The 9MPD model takes a step further with its advanced technology integration. It features a sophisticated control board that allows for easier diagnostics and enhanced system management. The 9MPD is also designed with quiet operation in mind, employing advanced sound-reduction technologies to minimize noise levels during heating cycles. Homeowners will appreciate the peace and quiet it brings, particularly in shared living spaces.

All three models are equipped with high-quality insulation and specialized heat exchangers that enhance their thermal efficiency. Additionally, they are designed with safety features such as automatic shut-off systems and robust flame rollout protection, ensuring a safe heating experience.

In terms of characteristics, these models are generally constructed with durable materials, designed to endure harsh weather conditions while providing consistent heating. They can be connected to various home automation systems, which adds to their appeal for tech-savvy consumers.

In conclusion, the Sears N9MP2, N9MP1, and 9MPD represent a comprehensive lineup of reliable, efficient, and technologically advanced heating systems suitable for contemporary homes. Their dedication to performance ensures that homeowners enjoy a warm and energy-efficient environment throughout the chilly seasons.