Sears N9MP2100J20B1, N9MP2050B12B1 Horizontal Right thru Top, Yellowor black, 16ID Rubber Tube

Models: 9MPD100J20B1 N9MP2100J20B1 9MPD050F12B1 N9MP1100J20B1 N9MP1125J20B1 N9MP2050B12B1 9MPD075F12B1 N9MP2100F14B1 N9MP2075B12B1 N9MP1100F14B1 9MPD100J14B1 N9MP1080F16B1 N9MP2080F16B1 N9MP2125J20B1 9MPD080J16B1 N9MP1050B12B1 9MPD125L20B1 N9MP1075B12B1

1 63
Download 63 pages 34.91 Kb
Page 23
Image 23

Horizontal

Right thru Top

 

 

 

Trap Connection

Single Pressure Switch Detail

Alternate

Orienation

"Clampears"

 

 

Yellowor black

_>

_

_i_>

Preassemble & insert into furnace

 

Coupling & Clamps

 

I--

 

(Optional)_

& Clamps

_._

 

VentDrain

 

WARNING

"_

 

Field

 

Add Cap and

_

 

_,_X S/uppliedTee

3/16"ID RubberTube\\

Clamp

 

 

 

Splice Connecto

 

,

 

 

 

 

/

_TeeTra p

Relief Tube Extension_

_

_

_

"

 

_

"Wh2ts(1°_P_rCsbag )

 

 

 

e

_

!_ O_j_ime

Model s

 

 

 

=__0 =

 

Drain Tube Black, /8

ID

J

 

1/2"

 

& barbed

 

 

 

 

 

coupling (Cut- to- fit)

 

CorrugatedCut at stralight sect_

 

 

 

 

 

 

Leaveroom for clamp

 

 

 

 

 

 

25-24-49

Horizontal Right Thru Top (SeeFigure16)

Disconnect the hoses from the Trap assembly, and remove Trap

and Trap mounting bracket from the blower compartment. Using cover plate and gasket provided in the loose parts bag, cover the

hole from the burner compartment to the blower compartment and secure with screws.

Mount the Trap externally to the bottom side of the unit using the 2 screws provided in the location shown.

Cut the corrugated tube as shown in the illustration above. Con- nect the corrugated hose from the transition to the Trap. Secure

connections with clamps.

Connect the black 1/2" ID Drain Tube from the Vent Drain to the Trap. If an extension is required, use the black 1/2" og barbed coupling and the black 1/2" ID Drain Tube in the loose parts bag.

Cut tube to length. Secure connections with clamps.

Connect the 3/16" ID relief tube to the middle port on the Trap. If an extension is required, use the clear 3/16" OD flexible tubing con-

nector and the black 3/16" ID relief tube in the loose parts bag. Cut tube to length.

Cut an appropriate length of 2" PVC pipe, fittings and extension pipe long enough to exit the cabinet and connect the vent drain to a standard field supplied 2" PVC tee

Install Tee Trap into bottom section of Tee.

Connect the Tee trap and the main drain line exiting the casing as shown in Figure 18.

Note: It is recommended that all PVC piping and fitting connec- tions be fit up and inspected before final cementing. Both the ex-

ternal Trap and the external Tee Trap must be primed before

operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.

440O1102004

[_

Page 23
Image 23
Sears N9MP2100J20B1, N9MP2050B12B1 manual Horizontal Right thru Top, Yellowor black, 16ID Rubber Tube, Relief Tube Extension