Sennheiser 2020 Putting the components into operation, Setting up the charging case

Models: 2020

1 65
Download 65 pages 42.87 Kb
Page 26
Image 26
Putting the components into operation

Putting the components into operation

Putting the components into operation

Setting up the charging case

Note:

The charging case as well as the accupacks and the receivers’ built-in rechargeable batteries will get hot during charging. Please ensure the following so that the generated heat can dissipate:

• The air vents of the charging case must not be covered or blocked.

The charging case must be kept away from heat sources and must never be exposed to direct sunlight.

During charging, do not put the case cover on the charging case.

The charging case has four plastic feet to ensure that it cannot slip on the surface on which it is placed.

CAUTION! Some furniture surfaces have been treated with varnish, polish or synthetics Setting up the charging case which might cause stains when they Manual backgroundManual backgroundManual background come into contact with other synthetics. Despite a thorough testing of the syn- thetics used by us, we cannot rule out the

possibility of staining.

Place the charging case on a flat, even surface.

Connect the supplied mains cable to the IEC mains socket on the charging case.

Connect the mains cable to a wall socket.

Note:

The case cover can be used as a stand for the charging case (see diagram on the left).

25

Page 26
Image 26
Sennheiser 2020 instruction manual Putting the components into operation, Setting up the charging case