Siemens L-828 manual Rack Mounting contd, Wiring Connections and Startup, Installation

Models: L-828

1 64
Download 64 pages 48.3 Kb
Page 25
Image 25
Rack Mounting (contd.)

L-828 CCRs LC-Type (4, 7.5, and 10 kW/6.6 A/60 Hz)

Installation

Rack Mounting (contd.)

Figure 3-2 Rack Mount Hardware Details

 

 

1.

Front of Cabinet

4.

Side Rail

7.

Back Rail

2.

Top Back Rail Bolt

5.

U-Channel Bolt

8.

Bottom Back Rail Bolt

3.

Nut with Spring

6.

U-Channel Bracket

9.

Front of U-Channel Bracket

Wiring Connections and Startup

WARNING: Installation and operation of the CCR should be performed by personnel qualified to work on high voltage equipment. The high voltage involved with the unit makes it potentially dangerous and may be lethal if contacted by operating personnel.

The regulator is delivered ready to operate when properly connected and should not require any electrical adjustments. The contractor responsible for installation will be required to supply items such as necessary wire, conduit, connectors, and mounting hardware.

2002 Siemens Airfield Solutions, Incorporated

96A0104B

Page 3-3

All rights reserved

Issued 6/02

 

Page 25
Image 25
Siemens manual Rack Mounting contd, Wiring Connections and Startup, L-828CCRs LC-Type4, 7.5, and 10 kW/6.6 A/60 Hz