Siemens L-828 manual Wiring Connections and Startup contd, Installation

Models: L-828

1 64
Download 64 pages 48.3 Kb
Page 26
Image 26
Wiring Connections and

L-828 CCRs LC-Type (4, 7.5, and 10 kW/6.6 A/60 Hz)

Installation

Wiring Connections and

Startup (contd.)

To install wiring, perform the following procedure:

1.Install all input and output cables. See Figure 3-3 for cable location, Figures 3-4 and 3-5 for Remote control wiring, Figure 3-6 for input/output wiring, and Figure 2-4 in the Description section for the internal parts of the CCR.

Figure 3-3 Location for Cables

1.Suggested Center for Load Cable (Conduit Cutout Center on 1.5-Inch Radius of Clearance)

2.Suggested Center for Radio Cable (Conduit Cutout Center on 1.5-Inch Radius of Clearance)

2002 Siemens Airfield Solutions, Incorporated

96A0104B

Page 3-4

All rights reserved

Issued 6/02

 

Page 26
Image 26
Siemens manual Wiring Connections and Startup contd, L-828CCRs LC-Type4, 7.5, and 10 kW/6.6 A/60 Hz, Installation