Smith Cast Iron Boilers GT Series manual External Air Intake and Vent Systems

Models: GT Series

1 44
Download 44 pages 38.95 Kb
Page 8
Image 8
Figure 9 - External Air Intake and Vent Systems

Page 8

GT INSTALLATION AND OPERATION INSTRUCTIONS

Figure 9 - External Air Intake and Vent Systems

Figure 11- Horizontal Concentric Terminal Location

 

SUPPORTS EVERY 24 IN

 

 

EXHAUST

 

Figure 10 - Debris Screen Installation20 FOOT MAX OUTSIDE

USING ONLY 3" PIPE ON

INLET

THE 150 & 200 AND 4" PIPE ON THE 400

12 IN ABOVE MAXIMUM SNOW LINE

The debris screens provided with the boiler must be installed in both the air intake and vent terminals. Install the screens in the outer most opening then glue a 1 in, 25 mm length of pipe into the opening to retain them, Figure 10.

Figure 10 - Debris Screen Installation

Concentric Air Intake and Vent Terminal GT-150 & 200 Only

If a concentric terminal is used it must be Smith part number GT-82666 or York part number 1CT0303. The concentric terminal must be located at least 12 in, 305 mm, above the normal snow line, Figure 11. Position the air intake pipe on the top or to the side to prevent rain from entering the boiler, Figure 13.

When terminals from multiple boiler installations exit a common wall the following conditions must apply:

1.If limited to two terminals the horizontal centerline distance must be 4 in, 102 mm, or greater than 24 in, 610 mm, to prevent flue gas recirculation. For more than two terminals located along a horizontal plane, the centerline distance between them must be 24 in, 610 mm, Figure 11.

2.If the terminals are located in a vertical plane the centerline distance between them must be at least 48 in, 1220 mm, Figure 12.

Figure 12 - Vertical Concentric Terminal Location

When penetrating an outside wall the concentric terminal must be constrained as shown in Figure 13.The opening through which the concentric terminal passes must be properly sealed to prevent products of combustion from entering the building. The air intake of the boiler must be connected to the terminal!

WARNING: Failure to properly install and seal the concentric terminal can result in excessive levels of carbon monoxide which can cause severe personal injury or death!

Page 8
Image 8
Smith Cast Iron Boilers GT Series manual External Air Intake and Vent Systems, Debris Screen Installation