3Pins extended through:
• Rack-mount flange
•Rail-mount flange
Pins not extended through:
• Rack-mount flange
• Rail-mount flange
Attach the frontrail bracket to the rack:
Pressthe tab 2 away from the rail. Slide the front
rack-bracket pins 1 away fromthe rail-mount
flange3 until the frontrail bracket stays open.
Place the rack-mount flange 4between the front
rack-bracket pins 1and the rail-mount flange3.
Pressthe tab 2away from the rail. The pins snap
forwardand extend through the rack-mount flange
and the rail-mount flange.
Attention: Make surethat the rail is securely
clamped against the rack-mount flange.
4
Server
Side release
latch
Rail-lock
pin
Insert the server into the rack cabinet:
Align the server on the slide rails and push the
server into the rack cabinet. If the rail-lock pins are
extended out, pull the side releaselatches toward
you, which lifts up the rail-lock pins. Push the
server into the rack the remainderof the way.
Install the cable-management arm:
Insert the cable-management arm into the five slots
in the rearof the server. When the
cable-management arm is inside all five slots, slide
the cable-management arm to the left by pulling the
locking cam back, away fromthe server.
6
Snap latch
Connect the cables and securethe
cable-management arm to the rack:
Pull the cable-management arm away fromthe
server,and connect the cables to the server. Route
the cables throughthe cable-management arm.
Move the cable-management arm towardthe rail on
the right side, and snap the latch onto the rail.