SSI America 90-2581 REV B manual Pulse Damper Installation, 5.6Cleaning the Pump

Models: 90-2581 REV B

1 48
Download 48 pages 44.76 Kb
Page 31
Image 31
5.5.3 Pulse Damper Installation

rebuilt. Do not attempt to refill or refurbish the pulse damper until you have a refurbishing kit. Instructions are furnished with the kit.

5.5.3 Pulse Damper Installation

1.Position the pulse damper, aligning it with the four mounting holes in the bottom of the cabinet. The pressure transducer should be pointed toward the rear of the cabinet.

2.From the underside of the pump cabinet, tighten the four screws to hold the pulse damper in place.

3.Connect the tubing from the pump head to the port at the rear of the pulse damper (i.e., toward the rear of the cabinet). Connect the line from the prime/purge valve to the other port, toward the front panel.

4.Connect the transducer’s wire harness connector to pressure board connector P3.

5.Replace the cover on the pump.

5.6Cleaning the Pump

1.Disconnect the column inlet tube from the column.

2.Direct the column inlet tube (the tube from the injector outlet) to a waste beaker.

3.Set the flow rate to maximum.

4.Turn the injector to the INJECT position.

5.Pump 100% methanol or isopropanol through the pump and injector for 3 minutes.

6.Pump 100% filtered, distilled water through the pump and injector for 3 minutes.

For stainless steel flow paths, proceed to Step 7; For PEEK ™ flow paths, skip to step 10.

WARNING: Use standard laboratory procedures and extreme care when handling strong acids and bases.

7.Pump a 20% nitric acid/water solution through the pump and injector for 3 minutes.

8.Flush the pump and injector with 100% filtered, distilled water for at least 3 minutes.

9.Pump 100% isopropanol through the pump and injector for 3 minutes.

The pump is now prepared for any mobile phase or short- or long-term shutdown.

7-12

Page 31
Image 31
SSI America 90-2581 REV B manual Pulse Damper Installation, 5.6Cleaning the Pump