2.INSTALLATION

2.INSTALLATION

2.1Unpacking and Inspection

Prior to opening the shipping container, inspect it for damage or evidence of mishandling. If it has been damaged or mishandled, notify the carrier before opening the container. Once the container is opened, inspect the contents for damage. Any damage should be reported to the carrier immediately. Save the shipping container. Check the contents against the packing list.

2.2Location/Environment

The preferred environment for the Binary Solvent Delivery Module is normal laboratory conditions. The area should be clean and have a stable temperature and humidity. The specific temperature and humidity conditions are 10 to 30 °C and 20% to 90% relative humidity. The instrument should be located on a stable flat surface with surrounding space for ventilation and the necessary electrical and fluid connections.

2.3Fluid Connections & Priming

There are only four connections to be made.

1.Connect left drawer pump solvent line supplied

2.Connect right drawer pump solvent line supplied

3.Connect line to injection valve from outlet “T”

4.Next, install the self flush. Connect the self flush inlet and outlet (opaque) tubing as shown on the the next page.

Details on the proper installation of tubing and priming of the pump and self flush is shown on the next page.

3-1

Page 8
Image 8
SSI America 90-2581 REV B manual Installation, 2.1Unpacking and Inspection, 2.2Location/Environment