SGB Batch Blender with Mitsubishi Controller Page 37 of 118
Installation & Setup 4

4-1 Chapter Description and Objectives

It is the intent of this chapter to familiarize the reader with the proper site
requirements and installation procedures of the SGB blending system. The
information in this chapter is NOT meant to replace or supersede an established
local or company implemented procedures. It is meant to enhance them.

4-2 Site Requirements

This section describes site requirements in detail. These requirements are
broken down into mechanical mounting, electrical connections and pneumatic
connections. Since the SGB is available in several different mounting
arrangements, it is necessary for the reader to become familiar with the different
arrangements.

4-2-1 Mounting Configuration

The SGB System is available in (3) three basic mounting arrangements.
They are:
Machine Mount
Mezzanine Mount
Floor Mount

4-2-1-1 Machine Mount

In a machine mounting application of the SGB unit, there are a
few items to review before placement and mounting of the
blending system begins.
First, verify the machine flange dimensions match the SGB
flange (if the optional pre-drilled holes were ordered). The SGB
can also be equipped with an optional cast throat section with a
drain port. This will bolt under the bottom plate of the blender.
Verify that the machine throat is physically capable of
supporting the SGB blending system with a full load of material
and vacuum loading equipment installed.
Important! While in operation, the SGB applies horizontal and vertical
pressures to the mounting flange. If there is a question as
to the mechanical stability of a mounting flange, contact
Sterling’s Engineering department.