3 | Installation |
|
|
3-1 Scope
This section contains all instructions required for experienced installation personnel to install the Sterling granulator and prepare it for production. It is essential to follow all instructions carefully and in the sequence presented. Be sure to observe all DANGER, WARNING, and CAUTION statements in order to prevent personal injury or machine damage, and to observe all NOTE statements which are designed to assist in the performance of procedures.
3-2 General
The site selected for installation of the granulator should be prepared in advance. Be certain that the area to be occupied by the machine is clean, level and free of obstructions. The site selected must have a floor rated to easily support the weight of the machine. A concrete floor of 4” minimum in thickness is recommended.
3-3 Set-up
Make certain the floor is clean, level, and free of obstructions before placing the machine into position.
Visually inspect the hopper infeed opening to insure that no stray packing material or debris are present.
BP1620, BP1628 & BP1640 Granulators | Page 15 BP1600 |