10-Pump, 80-Station Controller Chapter 3: Installation 36
Setting Up the System
Setting the Number of Stations and the Number of Pumps
1. Touch System Setup at the Station Status (or Pump Status) screen.
The System Setup screen appears:
Note: Touching Help in the lower right of this screen gives you a menu of
online help for the choices in this screen.
2. Touch Stations Present in the upper left of the System Setup screen.
3. This will take you to the Stations Installed screen.
A screen showing a list of stations appears. The stations that are not installed are red.
The stations that are installed are green. Briefly touching the icon for a station toggles
between not installed and installed. Briefly touching the icon for a node toggles the
node’s configuration between 2 stations per block and 1 station per block.
When configured for 2 stations per block, each of the stations on the block will have
one optional input and one optional output. If more optional equipment needs to be
used with a station (for example if a station requires an RPV and a Slide Gate), the
block should be configured for 1 station per block.
When configured for 1 station per block, the station on the block will have three
optional inputs and three optional outputs. This will allow more optional equipment
to be used with a single station than the 2 stations per block allows. Each station
block configured in this manner will reduce the number of stations the control can
support by one.