10-Pump, 80-Station Controller Chapter 8: Appendix 94
9. The Load Application Screen (Fig 14) will appear.
Fig 14
10. Press the “Source [F1]” button so the circle next to “External Storage 1” is filled.
11. Use the up and down arrows to select the “VersaViewCE_LockDown.mer” application.
12. Press the “Load [F2]” button.