10-Pump, 80-Station Controller Chapter 4: Operation 57
The button changes to Priority Convey Active and blinks until the station’s
demand has been satisfied (or you stop the priority convey).The controller begins
filling the chosen station only (after finishing any convey already in progress).
To stop a priority convey before the station is completely full:
Touch the blinking Priority Convey Active.
The button changes to Priority Convey Activate and stops blinking. The
controller finishes the current convey, if any, and resumes normal operation.
Changing the Mixture for a Remote Proportioning Valve
A remote proportioning valve (RPV) mixes two different materials, typically virgin and
regrind materials, during a convey cycle. If present, this valve may be set up so that you
control the mix with a timer at the station, or it may be set up so that you control the mix with
the controller’s touch screen. The instructions here apply only for controlling the mixture
from the touch screen.
The controller refers to the two materials as Material A (primary) and Material B (additive).
The system is set up so that, if there are any inaccuracies in the proportions, the mix will
contain more Material A and less Material B.
To change the mixture for the remote proportioning valve:
1. Go to the Station n Operator screen (as described on page 55), or go to the Station n
Setup screen.
2. Touch RPV Material B.
A keypad pops up.
3. Enter the desired percentage for the additive material. Use ← to erase any mistakes.
Use ↵ to enter the value. The new setting appears under RPV Material B.