Sterling Plumbing 6103 Series Position the Bath, Install a Mortar Cement Bed Optional, Sterling

Models: 6103 Series

1 40
Download 40 pages 4.09 Kb
Page 17
Image 17
Position the Bath

Verify that the bath is level.

Vérifier que la baignoire est nivelée.

Verifique que la bañera esté a nivel.

Studs

Montants

Postes de madera

Shim if necessary.

Caler si nécessaire.

Utilice cuñas si es necesario.

Position the Bath

CAUTION: Risk of product damage. Do not lift or move the bath by the apron or apron braces. Verify that the apron braces are attached before installing the bath, then lift the bath by the rim at multiple points.

NOTE: Keep a liner or drop cloth in place in the bottom of the bath until construction is complete.

Install the drain and overflow assembly to the bath according to the drain manufacturer’s instructions.

IMPORTANT! Squeaking may develop if the bath is installed over a subfloor other than plywood. In order to prevent squeaking, place a pad between the bath and the subfloor and positioned under the bath supports. We recommend that the pad be made of spun bonded polyester landscape fabric or spun bonded house wrap material. Do not use roofing felt.

Position the pad under the bath supports.

Position and adjust the bath until its outside edge is flush with the framing.

Verify that the bath is level and well supported by the subfloor.

If the bath is not level, shim using metal, hardwood, or other durable material. Reposition and shim the bath until it is aligned with the framing and level.

Install a Mortar Cement Bed (Optional)

Remove the bath and pad from the alcove.

NOTE: Do not use plaster, gypsum cement, or drywall compound for this application, as they will not provide adequate structural support.

Sterling

17

1064907-2-A

Page 17
Image 17
Sterling Plumbing 6103 Series manual Position the Bath, Install a Mortar Cement Bed Optional, Sterling