INSTALLATION INSTRUCTIONS
INSTALLATION
13
wall plate | AR1887 |
|
Because of the high temperatures this fire achieves, it is advisable to use marble slips or similar material between the appliance and the plasterboard
Never use a
•Connect the flue system and gas services using the opening in the side of the chimney breast for access. After commissioning, finish the sides of the chimney breast, Diagram 14
14
AR1905
3.3STUD WORK INSTALLATION METHOD 2 (EDGE)
For this
There is an optional Studio 1 Edge Fixing Kit available for installing the fire without a frame. CODE No. 8727CFFK01 (STUDIO 1) 8727CFFK02 (STUDIO 2).Using the fixing kit:
•Fit the two side and bottom channels to the front flange of the fire, Diagram 15. There is a deliberate gap at the top for convected heat
15
This now determines the width of your two vertical stud work supports. The kit has been designed so that 12mm thick plasterboard can be taken to the three channels, Diagram 16
16
AR1934
•Fix the edge of the vertical support flush to the edge of the channel
Build the stud work chimney breast to the desired size:
•Ensure all clearances to combustible material are maintained, 3.1 above
17
AR1902
•Fit
•Fit plasterboard to the remaining chimney breast front
•Decide on the position for the wall box containing the batteries and wall switch
•Mount it into the stud work chimney breast connecting up the wires from the fire, see Stud Work Installation with Frame for wiring detail on previous page
•Connect the flue system and gas services using the opening in the side of the chimney breast for access
After commissioning, finish the sides of the chimney breast, Diagram 18
AR1912
16