COMMISSIONING

COMMISSIONING

7.COMMISSIONING

7.1Check the flame picture

7.2Check the gas pressure

7.3• Close all door and windows in the room

Ignite the Studio and operate on maximum for 5 minutes

Position a lighted smoke match just inside the draught diverter opening and check all smoke is drawn in along the opening

If there is any doubt:

Run the appliance for a further 10 minutes and repeat the test, Diagram 40

40

AR0757

If there are any extractor fans in the room or adjacent rooms, the test must be repeated with the fans running on maximum.

IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE

AND SEEK EXPERT ADVICE.

For future reference, record the installation details on the

Commissioning Sheet on page 3.

22

Page 22
Image 22
Stovax P8700CFCHEC, P8701CFCHEC manual Commissioning Sheet on page

FAQ

What is the first step in commissioning Stovax Stove?

The first step is to check the flame picture to ensure it is as expected.

Why is it important to check gas pressure during commissioning?

Checking gas pressure ensures that the stove is operating at the correct levels for optimal performance.

What should I do if there is spillage during the commissioning test?

If spillage persists, it is recommended to disconnect the appliance and seek expert advice.