Subaru R1100 Reassembly Procedures, Cylinder baffle, Tightening torque, N ・m, 70-90, kgf ・cm

Models: R1100

1 57
Download 57 pages 49.55 Kb
Page 35
Image 35
5-4) REASSEMBLY PROCEDURES

5-4) REASSEMBLY PROCEDURES

5-4-1 Cylinder baffle

Install the cylinder baffle. (Tighten together)

M8 x 16mm Flange bolt : 3pcs.

Tightening torque : 11.0-13.0 Nm 110-130 kgfcm (8.1-9.6 ftlbs)

M6 x 12mm Flange bolt : 1pce.

Tightening torque : 7.0-9.0

Nm

70-90

kgfcm

(5.2-6.6

ftlbs)

 

 

5-4-2 Ignition coil

Install the ignition coil into the ignition coil bracket and

attach it to the engine.

Ignition coil bracket tightening torque

M6 x 14mm Flange bolt : 2pcs.

Tightening torque : 7.0-9.0

Nm

70-90

kgfcm

(5.2-6.6

ftlbs)

 

 

5-4-3 Muffler

Install the muffler.

M8 x 80mm Flange bolt : 1pce.

Tightening torque : 11.0-13.0 Nm 110-130 kgfcm (8.1-9.6 ftlbs)

M6 Flange nut : 2pcs.

Tightening torque : 7.0-9.0

Nm

70-90

kgfcm

(5.2-6.6

ftlbs)

 

 

Cylinder baffle

Ignition coil

Muffler

– 32 –

Page 35
Image 35
Subaru R1100 Reassembly Procedures, Cylinder baffle, Tightening torque 11.0-13.0 N・m 110-130 kgf・cm 8.1-9.6 ft・lbs, N ・m