Attach the connectors to the brush holders. Connector the green wire to the stator end and the brown wire to the bearing end.

Install the brush cover.

(5)(RGV13100T only)

Attach the end cover to the rear cover.

(6)Tighten the nuts over the mount rubber bolts to fix.

Tightening torque

120 -140 kg cm

11.8-13.7 Nm 8.7-10.1 ft lbs

Fig. 9-12

NOTE : When tightening the nuts, slightly lift the alternator assembly so that the weight is not applied to the mount rubbers.

(7)Fasten the earth cable to the unpainted bolt hole on the frame.

EARTH CABLE

Fig. 9-13

43

Page 46
Image 46
Subaru Robin Power Products RGV12100, 13100T service manual - 43-