vii
Figures
FIGURE1-1 Netra ft1800 Airflow Requirements (External) 4
FIGURE1-2 Netra ft1800 Airflow Requirements (Internal) 5
FIGURE2-1 Shipping Brackets and Sacrificial Plinth 11
FIGURE2-2 Location Matrix For Mounting Flange Screws (19-inch rack) 14
FIGURE2-3 Support Rail and Fixings (19-inch Rack) 15
FIGURE2-4 Orientation of Support Rail Spacers 16
FIGURE2-5 Rear Rack Mounting (19-inch Rack) 16
FIGURE2-6 19-inch Rack Mounting Flange Kit 17
FIGURE2-7 23-inch Rack Mounting Flange Kit 19
FIGURE2-8 24-inch Rack Mounting Flange Kit 20
FIGURE2-9 600-mm Rack Mounting Flange Kit 21
FIGURE2-10 Cable Bracket Assembly 22
FIGURE2-11 Module Injector/ejector Lever 24
FIGURE2-12 Removing a CPUset Module 26
FIGURE2-13 Removing a CAF 27
FIGURE2-14 Removing a PCI Card Carrier 28
FIGURE2-15 Removing a Power Supply 29
FIGURE2-16 Removing an RMM Module 31
FIGURE2-17 Removing a Disk Drive 33