56 Netra ft 1800 Installation Guide February 1999
4. Push the other On system switch (on the other CAF front panel).
FIGURE4-1 System Switches (Front Panel)
The PSU, CPUset and CAF Power LEDs will successively light, and the terminal will
display the output from the Power On Self Test(POST). The POST sequence may
take some time.
The CPUset LEDs will perform their own test sequence towards theend of the POST
procedure, then the TargetLED on one of the CPUsets will flash as the OBP ok
prompt appears.
CAF
On
switch Standby
switch