24 Models H71 & H84Operating Procedures
Step 4
Install the freezer door. Insert the baffle rod(s) through
the opening in the beater assembly(ies) and seat the
door flush with the freezing cylinder(s). With the door
seated on the freezer studs, install the handscrews.
Tighten equally in a criss-cross pattern to insure t he
door is snug.
Figure 7
Note: Onthe M odel H84, the short handscrews go on
the bottom and the long handscrews go on top.
Step 5
Installthe draw valv e(s). Slide the three o-rings into the
grooves on the draw valve(s) and lubricate.
Figure 8
Note: The Model H84 has three draw valves. For the
left and right draw valves, follow the assembly and
lubrication procedures explained previously. The
center draw valve uses a seal and an o-ring. Slide the
sealand o-ring into t he grooves on the draw valve, and
lubricate.
Lubricate the inside of the freezer door spout(s), top
and bottom, and insert the draw valve(s) from the
bottom until the slot in the draw valve(s) comes into
view.
Figure 9
Step 6
Install the draw handle(s). Slide the o-ring into the
groove on the pivot pin, and lubricate.
Figure 10
Slidethe fork of thedraw handle over t he barin t heslot
of the draw valve. Secure with pivot pin.
Figure 11