Manuals
/
Thermo Products
/
Household Appliance
/
Furnace
Thermo Products
OL6RX072DV5(R) Vacuum Hose Length OL6 8FT, Heat Exchanger Clean-Outs
Models:
OL6FX072DV5(R)
OL6RX072DV5(R)
OL6RA072DV5(B/R)
OL6FA072D48(B/R)
OL6RA072D48(B/R)
OL6FA072DV5(B/R)
1
52
75
75
Download
75 pages
52.42 Kb
49
50
51
52
53
54
55
56
Troubleshooting
Install
Oil Nozzle Capacity Chart
Maintenance
Configuration
A. Diagnostics
Assembly
N. Startup Procedures
Preferred method of adjustment
Thermostat Anticipator Setting
Page 52
Image 52
Figure 24: Heat Exchanger
Clean-Outs
Vacuum Hose Length
OL6 8FT
Fig. 25: Recommended method and device for cleaning inside of heat exchanger.
49
Page 51
Page 53
Page 52
Image 52
Page 51
Page 53
Contents
OL6RA072D48B/R
OL6FA072D48B/R
OL6RA072DV5B/R
OL6RX072DV5R
CONTENTS
Configuration
Feature
Model Number Digit
Fuel
I. SAFETY SECTION
cWARNING AND CAUTIONS
cCAUTION DO NOT ATTEMPT TO START THE BURNER WHEN
1.Excess oil has accumulated
Page
A. CODES AND CLEARANCES
a. Combustible material
b. Non-combustiblematerial
A. CHIMNEY
TYPE OF
FROM
MODEL NO
1. PROPER CHIMNEY SIZE
2. PREVENTION OF CHIMNEY CONDENSING
4. PROPER VENT CONNECTOR PIPE/CHIMNEY CONNECTION
3. PROPER CHIMNEY HEIGHT
7. TIGHT CLEAN-OUTDOORS AND CONNECTIONS
6. TIGHT JOINTS
8. NO INTERCONNECTED CHIMNEY FLUES
9 FLUE PIPE CLEARANCES, SIZING AND TYPE
B. VENTING
C. DRAFT REGULATORS
ROTATION OF FRONT FLUE ELBOW
Note Do not use with Direct Vent application
D. DUCT WORK/AIR CONDITIONING
Airflow Requirements and Sizing of Duct Work
Page
The ASHRAE Handbook - Fundamentalsis an excellent source of duct system design principles and pressure drop data. Conversely, for a specified type of fitting, it is also possible to determine the required size or diameter of the component for a specified pressure drop and flow rate
1.HEATING CFM HEAT OUTPUT OF FURNACE BTUH
1.1 X TR TEMPERATURE RISE, F = HEATINGCFM
E. Air Filters Mounted Internal to Furnace
Maximum
Model Number
Filter Type
F. LIMIT POSITION AND LOCATION
G. BURNER INSTALLATION
DO NOT CHANGE POSITION OF THE CHAMBER
H. BURNER SPECIFICATIONS AND APPLICATIONS
OIL NOZZLE CAPACITY CHART
+ INSULATOR S = SLEEVE OR N = NONE
NOZZLE SIZE
2 STAGE FIRING RATES
CAPACITY
FIRING
NOZZLE SIZE
MOUNTING THE 2-STAGERIELLO BURNER
I. OIL TANK AND PIPING
5.A readily accessible, design-certified,manual oil shutoff valve, with a non-displaceablerotor member, shall be installed in the fuel oil supply piping within 6 feet of the appliance
J. OIL FILTER
K. ELECTRICAL WIRIING
Assembly
Maximum
Wire size selections in Table 10 are based upon Table 310-16of the National Electrical Codefor three copper conductors, with insulation rated for 75 degrees Celsius, contained in raceway at 30 degrees Celsius. For other wire insulation temperature ratings and ambient conditions, refer to the National Electrical Codefor the minimum wire sizing requirements
Thermostat Anticipator Setting
Preferred method of adjustment
L. Blower Motor Speed Selection
Heating Speed Set-ups
OL6*A072DV5
Furnace Motor Current
Draw Amps/ / Watts vs
LOW CAPACITY
HIGH CAPACITY
= Recommended heating speed setting
Heating Speed Set-ups 2 - Stage OL6*X072DV5
Cooling Speed Set-ups OL6**072DV5
Furnace Motor Current
Draw Amps / Watts vs
External Static Pressure in W.C
Page
M. BLOWER CONTROLLER INFORMATION FOR PSC MOTOR
TERMINAL DEFINITIONS & FIELD WIRING
A. Inputs
B. Outputs
C. Operating Modes
Heat Mode
PSC TROUBLE SHOOTING
DIAGNOSTIC FEATURES
N. STARTUP PROCEDURES
Operating Instructions
For Your Safety Read Before Operating
i.STOP! Read the safety information above
2. Adjustment of Burner Combustion
To Turn Off Oil to Appliance
COMBUSTION HEAD SETTING FOR 2-STAGERIELLO BURNER
TURN TO THE RIGHT SIGN +
AIR DAMPER ADJUSTMENT
TURN TO THE LEFT SIGN
1st STAGE ADJUSTMENT
2nd STAGE ADJUSTMENT
3. Adjustment Of Heat Input Rate
Notice Minimum return air temperature is 55F
4. Setting Supply Air Temperature Rise
5. Checkout Procedure
III. USERS INFORMATION SECTION
C. INSPECTION AREAS
cCAUTION DO NOT ATTEMPT TO MAKE REPAIRS YOURSELF
cCAUTION DO NOT ATTEMPT TO START THE BURNER WHEN
E. FILTER CLEANING AND LOCATION
D. STARTING THE BURNER
IV. INSTALLERS INSTRUCTIONS TO USER
A.GENERAL INSPECTION
V. DEALER MAINTENANCE
SAFETY DURING SERVICING AND INSPECTION
C. HEAT EXCHANGER CLEANING INSTRUCTIONS
B. HEAT EXCHANGER
Figure 24 Heat Exchanger Clean-Outs
Vacuum Hose Length OL6 8FT
Filter maintenance procedure
D. ELECTRICAL SYSTEM
E. SUPPLY/RETURN AIR BLOWER
F. SUPPLY/RETURN AIR FILTER
Filter replacement
G. EXTENDED APPLIANCE SHUTDOWN
ON STARTUP
2.Remove the furnace front door
Beckett Burner
Riello Burner
VII. TROUBLESHOOTING
A. DIAGNOSTICS
Diagnostic Features
PERSONNEL, AND NOT BY THE FURNACE OWNER
B. CAD CELL CHECKOUT PROCEDURE
VIII. Sequence of Operations Flow Chart
Page
IX. Trouble Shooting Flow Chart
Page
Page
Page
Page
HEATING
CUSTOMER
SYSTEM
Appendix - A Replacement Parts
Replacement Parts for OL6F*072D
Page
Replacement Parts for OL6R*072D
Page
Appendix - B Wiring Diagrams
OL6*A072D48 PSC Wiring Diagram
OL6*A072DV5 ECM Wiring Diagram
OL6*X072DV5 ECM 2-StageWiring Diagram
Top
Page
Image
Contents