B.CAD CELL CHECKOUT PROCEDURE: (OMD ONLY)

All installations and services must be performed by qualified service personnel.

B.CAD CELL CHECKOUT PROCEDURE: (OMD ONLY)

1.Remove cad cell lead wires, then start the burner. Shortly after burner starts, place a temporary jumper between terminals f & f of the oil primary control. Connect ohmmeter across cad cell lead wires - resistance should be less than 1600 ohms.

2.Stop the burner and remove temporary jumper.

3.With the burner off, check dark cell resistance across cad cell lead wires. Resistance should be greater than 20,000 ohms. If cell resistances are different from above, recheck wiring, location of cell, etc. If necessary, replace plug in portion of cell, (Part No. 350104).

4.Reconnect cad cell lead wires. Check out the oil primary control according to the instructions packed with the control.

C.HEAT EXCHANGER CLEANING INSTRUCTIONS

C.HEAT EXCHANGER CLEANING INSTRUCTIONSManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background: The heat exchanger must be cleaned by a qualified service person.

For oil-fired units, it is important to inspect and clean the heat exchanger once a year, or as necessary, to remove any build-up of soot. A layer of soot on the inside of the heat exchanger will act as an insulator, reducing heat transfer, resulting in reduced efficiency

For gas-fired units, the presence of a layer of soot on the heat exchanger is a strong indicator of incomplete combustion. The burner adjustment should be rechecked as well as the firing rate, the combustion air supply, and the vent system.

To clean the heat exchanger,

1.First, turn off all power to the unit.

2.Remove the clean-out plate, immediately above the burner (refer to Figure 8), to gain entry to the cleanout covers.

3.Remove cleanout covers, the vent connector pipe to the chimney, the burner and the burner mounting plate. When removing the cleanout cover, special care must be taken not to damage the gaskets or high limit switch.

NOTE: The high limit switch may be removed for easier access to the left-hand cleanout cover by removing the two (2) limit mounting screws. The limit must be reinstalled in the original orientation before operating the furnace.

Should the gaskets separate, crack, break, or otherwise not be able to provide the necessary seal, the gasket must be replaced before reattaching the cleanout cover.

40

Page 41
Image 41
Thermo Products omd-70 service manual B.Cad Cell Checkout Procedure: Omd Only, C.Heat Exchanger Cleaning Instructions