1

Note: Inspect door for smooth rolling and proper balancing before installing Air Powered Operator.

Part 1:BELT INSTALLATION

Step 1

Determine which side of door to install the air powered operator. 6” of shaft is required beyond track bracket.

Clearance Requirements

8” of side clearance is required to mount operator.

Page 3
Image 3
Ultimate Products UP-206 manual Part 1BELT Installation