Valor Auto Companion Inc 739DVP, 739DVN owner manual Log Installation, Ceramic Logs Installation

Models: 739DVP 739DVN

1 31
Download 31 pages 52.33 Kb
Page 19
Image 19
Log Installation

Log Installation

13.1 Ceramic Logs Installation

1.Install the Rear Log Rest supplied using 3 screws provided. See figure 13.1.

2.Place the Ash Bed in position. The projections at the front of the Ash Bed are positioned against the sloping metal stops, immediately behind the burner. See figures 13.2, 13.8, 13.9.

3.Place the Rear Log in position. Place the Log on the 2 pins on the top left and right of the Ash Bed. See figure 13.3.

4.Place the Front Log at the front of the firebox locating it on the front support. See figure 13.4.

5.Place the Left Side Center Log in position, locating the thick part on the left side of the Ash Bed on the 2 pins provided, with its “nose” resting on top of the Ash Bed center projection. See figure 13.5.

6.Identify the Right Side Center ‘Y’ log. Place the Right Side Center Y Log in position, locating the thick part on the right side of the Ash Bed on to the pin provided with its “nose” located on the single pin. See figure 13.6.

7.Install the Cross Twig by first mounting the rear of the Cross Twig on the pin situated on the top of the Rear Log near the center. Then, move the front of the Cross Twig until it finds its location in the cradle provided in the Front Log. See figure 13.7.

19

Page 19
Image 19
Valor Auto Companion Inc 739DVP, 739DVN owner manual Log Installation, Ceramic Logs Installation