CDV Series Direct Vent Gas Fireplace

Below Grade Installations

When it is not possible to meet the required vent ter- minal clearances of 12” (305 mm) above grade level a snorkel vent kit #7TDVSNORK is required. It allows installation depth of down to 7” (178 mm) below grade level. The 7” is measured from the center of the hori- zontal vent pipe as it penetrates through the wall.

If venting system is installed below ground, we recommend a window well with adequate and proper drainage.

Ensure sidewall venting clearances are observed.

Do not back fill around snorkel. A clearance of at least 4” (102 mm) must be maintained between the snorkel and the soil.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as protruding wall face. (Fig. 31)

The maximum horizontal run with 24” vertical rise is 36” (914 mm) from the back of the fireplace to the face of the exterior wall. See vent graph (Page 12) for extended horizontal run if the vertical rise exceeds 24” (610 mm).

1.

Establish vent hole through the wall. (Fig. 13)

2.

Remove soil to a depth of approximately 16”

 

(406mm) below base of snorkel. Install window

 

well (not supplied). Refill hole with 12” (305 mm) of

 

coarse gravel leaving a clearance of approximately

Foundation Recess

Recess Brackets

Watertight Seal

Around Pipe

Snorkel

Wall Screws

Sheet Metal

Screws

BG401

 

4” (102 mm) below snorkel. (Fig. 30)

3.

Install vent system. See Page 12, Steps 2 through 5.

4.

Ensure a watertight seal is made around the vent

 

pipe coming through the wall.

5.

Apply high temperature sealant caulking (supplied)

 

around the 4” and 7” snorkel collars.

6.

Slide into the vent pipe and secure to the wall.

7.

Level the soil to maintain a 4” (102 mm) clearance

 

below snorkel. (Fig. 30)

Fig. 31 Snorkel installation, recessed foundation.

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

1.Vertical installations up to 40’ (12 m) in height. Up to 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of three 90° elbows.

7TDVSNORK

(Snorkel)

Maximum

4” (102mm) Clearance

Minimum

10’ (3 m)

Firestop

7” Pipe

24" (610mm)

Minimum*

Min.

Window Well

Gravel

Drain

Foundation Wall

*A minimum of 24” (608mm) vertical pipe must be installed when using 7TDVSNORK Kit.

8’ (2.4 m) / Maximum

40’ (12 m) Vertical Rise

Pipe Straps Every 3’ (914 mm)

CFM148

Fig. 32 Support straps for horizontal runs.

2. Up to two 45° elbows may be used within the

horizontal run. For each 45° elbow used on the

BG400

Fig. 30 Below grade installation.

horizontal level the maximum horizontal length must

be reduced by 18” (457 mm).

18

20010175

Page 18
Image 18
Vermont Casting 36CDVTRN, 36CDVRRN Below Grade Installations, Vertical Through-the-Roof Applications