Framing and Finishing

Check fireplace to make sure it is levelled and properly positioned.

To mount the appliance:

1.Choose the location.

2.This unit comes with four (4) flanges pre-mounted on both sides of the fireplace to allow two different drywall thicknesses to be used. Flange “A” is for 1/2” drywall while flange “B” is for 5/8” drywall.

3.Bend the desired flanges out 90° on both sides of the fireplace. Slide the fireplace into the framed opening until the flanges contact the front surfaces of the framing. Level the unit and secure it firmly in place.

4.The standoffs are adjustable for different drywall thicknesses. The unit is shipped from the factory at 1/2” (13 mm). Loosen the four (4) screws securing each standoff to the top of the fireplace. Slide the standoff back. Tighten the screws. This yields a 5/8” (16 mm) thick drywall space. Removing the standoff and having the tabs on the standoff face the rear of the unit yields a 3/4” (19 mm) drywall space. (Fig. 4)

NOTE: Drywall must stop at standoffs and not touch top of unit.

Flange

Drywall

Flange Location for Desired

Position

Depth

Drywall Depth at Header

A1/2” / 13 mm

B

5/8” / 16 mm

B A

FP1603

Standoff Location for Desired Drywall Depth at Header

Screws

Tabs

FP1603a

Fig. 4 Nailing flanges and standoffs.

20010175

CDV Series Direct Vent Gas Fireplace

Hood Installation

CAUTION: Hood MUST be permanently installed.

1.Remove top louvre. Carefully remove hood from inside top louvre opening.

2.Remove three (3) sheet metal screws in bottom flange of fireplace surround top.

3.Install the hood by aligning the three holes in bottom flange of fireplace surround top. (Fig. 4a)

4.Secure hood to bottom flange of fireplace surround top using three screws removed in Step 2. (Fig. 4a)

5.Carefully remove protectors under the relief plates on top of the firebox.

6.Replace top louvre.

Hood

Sheet

Metal

Screws

FP1609

Fig. 4a Secure hood to fireplace with sheet metal screws.

Final Finishing

Noncombustible materials such as brick or tile may be extended over the edges of the face of the fireplace. DO NOT cover any vent or grille panels.

If a Trim Kit is going to be installed on the fireplace, the brick or tile will have to be installed flush with the edges of the fireplace.

36CDVR / 36CDVT

Certified To

ANSI Z21.88b-2003 / CSA 2.33b-2003

Vented Gas Fireplace Heaters

36CDVRRN Units: GFRL1J0

36CDVTRN Units: GFTN1J0

Gas Specifications

 

 

 

Max.

Min.

 

 

 

Input

Input

 

 

 

Model

Fuel

Gas Control

BTU/h

BTU/h

36CDVRRN

Nat

Millivolt

21,000

14,700

36CDVRRP*

Prop

Millivolt

21,000

15,750

36CDVTRN

Nat

Millivolt

21,000

14,700

36CDVTRP*

Prop

Millivolt

21,000

15,750

*Using conversion kit

7

Page 7
Image 7
Vermont Casting 36CDVRRN, 36CDVTRN Framing and Finishing, Hood Installation, Final Finishing, Gas Specifications