TABLE OF CONTENTS
PLEASE READ THE INSTALLATION & OPERATING INSTRUCTIONS BEFORE USING APPLIANCE.
IMPORTANT: Read all instructions and warnings carefully before starting installation. Failure to follow these instructions may result in a possible fire hazard and will void the warranty.
Installation Instructions | 3 |
Important Curing/Burn Information | 3 |
Locating your Fireplace | 3 |
Fireplace Dimensions | 4 |
Mantels | 5 |
Mantel Chart | 5 |
Clearance to Combustibles | 5 |
Framing & Finishing | 5 |
Final Finishing | 6 |
Hearth | 6 |
Gas Specifications | 6 |
Gas Line Installation | 7 |
Remote Switch Installation | 7 |
General Information on Assembling Vent Pipes | 8 |
General Venting Information | 9 |
Termination Clearances | 10 |
Rear Venting Applications | 10 |
Rear Wall Installations | 11 |
Vertical Sidewall Applications | 12 |
How To Use the Vertical Sidewall Vent Graph | 13 |
General Information on Assembling Vent Pipes | 13 |
Vertical Sidewall Installation | 14 |
Below Grade Installations | 16 |
Vertical Through the Roof Applications | 16 |
Vertical Through the Roof Installations | 17 |
Operating Instructions | 18 |
General Glass Information | 18 |
Louvre Removal | 18 |
Glass Frame Removal | 18 |
Glass Cleaning | 18 |
Installation of Logs | 19 |
Ember Material Placement | 19 |
Lava Rock | 19 |
Flame Adjustment | 19 |
Flame Characteristics | 20 |
Inspecting the Venting System | 20 |
Maintenance | 20 |
Cleaning the Standing Pilot Control System | 20 |
Lighting and Operating Instructions | 21 |
Troubleshooting Gas Control (820 Millivolt Gas Valve) | 22 |
Troubleshooting Gas Control (822 Millivolt Honeywell Valve) | 23 |
Replacement Parts List | 24 |
Replacement Parts Pictorial | 25 |
Optional Accessories Kits | 26 |
Fan Kit | 26 |
Wiring Instructions | 26 |
Electrical Box EB1 | 27 |
Bay Window Installation | 27 |
Screen Kit Installation | 28 |
Ceramic Refractory Lining | 28 |
Remote Control | 28 |
Crimped End Venting Components | 29 |
Twist Lock Venting Components | 30 |
- 2 -