Vermont Casting DBR33 OPTIONAL BAY WINDOW INSTALLATION for DBR36/DBR39

Models: DBR36 DBR33 DBR39

1 32
Download 32 pages 15.6 Kb
Page 27
Image 27
OPTIONAL EB1 (Receptacle) Hook-Up

FAN

TEMPERATURE

SENSOR

SPEED

CONTROL

Black

White

Ground

Fig. 54

Method B (Using the EB-1 Box.)

For instruction on wiring the EB-1 Electrical Junction Box see the chapter EB-1 Electrical Box.

OPTIONAL EB1 (Receptacle) Hook-Up

The EB-1 Electrical junction box when fitted and correctly wired gives an easy and convenient power outlet for the optioal fan kit.

If the EB-1 electrical junction box is being fitted the fireplace must be electrically connected and grounded in accordance with local codes or, in the absence of local codes, with the current CSA C22.1 Canadian Electric Code.

For U.S.A. installations follow the local codes and the national electrical code ANSI/NFPA No 70.

It is strongly recommended that the wiring of the EB-1 Electrical Junction Box be carried out be a licensed electrician.

Ensure that the power to the supply line has been disconnected before commencing this procedure.

 

ELECTRICAL BOX

 

FASTENING

GAS INLET HOLE

OUTSIDE VIEW

SCREWS

 

 

 

 

INSIDE VIEW

 

 

 

Fig. 55

OPTIONAL BAY WINDOW INSTALLATION

for DBR36/DBR39

1.Remove existing bottom louvre and hinges from fire- place. (Set aside the two (2) self tapping screws).

2.Remove existing top louvre from fireplace.

3.Remove two (2) pieces of ceramic refractory from Bay Frame Window; considering that these are very fragile pieces handle them with special care!

4.Assembly Bay Window Frame to Bottom Bay Louvre by using four (4) machine screws (from top to bottom), four

(4) nuts (in the bottom) and four (4) spaces (all supplied with the kit) through the existing four (4) holes in the bottom of the ay Window Frame and in the top of the Bottom Bay Louvre. Spacers to be placed between the Bay Window Frame and the Bottom Bay Louvre.

5.Insert two (2) pieces of ceramic refractory into the Bay Window Frame as per drawing below.

6.Hang Bay Window Frame assembly over existing glass frame.

Do not remove existing glass frame

7. Re-install top louvre assembly.

To install and connect the EB-1 box to the house electrical supply follow the steps below.

1.Disconnect the power to the electrical supply line.

2.Remove the cover plate over the EB-1 knock-out the side of the appliance, retain the screw that held the plate.

3.Remove the front cover of the EB-1 box.

4.Remove the plug socket assembly from the EB-1 box.

5.Feed the electrical supply line in through the EB-1 opening in the side of the appliance and then through the back of the EB-1 assembly, Fig 55.

6.Connect the ground wire of the supply line to the green screw of the socket assembly.

7.Connect the white wire of the power line to the chrome screw of the socket assembly.

8.Connect the black wire of the power supply line to the brass screw (polarized) of the socket assembly.

9.Refit the socket assembly back into the electrical box and replace the front cover plate. Secure the cable with the clamp on the outside of the EB-1 base plate and refit the EB-1 assembly to the appliance with the screw removed in step 2.

Remove all plastic from brass trims

8.Open the Bottom Bay Louvre door and screw two (2) self tapping screws (as per step 1 above) to the bottom of the unit where the hinges were.

9.Bottom brass trim is removable when unit is installed with marble or tile surround which cover the fireplace bottom.

 

TOP LOUVRE

 

BAY WINDOW FRAME

CERAMIC REFRACTORY

CERAMIC REFRACTORY

 

 

SPACERS

 

BOTTOM BAY LOUVRE

BOTTOM

 

BRASS

 

SCREWS

Fig. 56

- 27 -

Page 27
Image 27
Vermont Casting DBR33 OPTIONAL BAY WINDOW INSTALLATION for DBR36/DBR39, OPTIONAL EB1 Receptacle Hook-Up