Vermont Casting DVRTSB manual EB-1Electrical Box, Remote ON/OFF Switch Installation, 10003848

Models: DVRTSB

1 36
Download 36 pages 29.08 Kb
Page 8
Image 8
EB-1 Electrical Box

DVRTSB Bay Window Fireplace

EB-1 Electrical Box

The fireplace, when installed, must be elec- trically connected and grounded in accord- ance with local codes or, in the absence of local codes, with the current CSA C22.1 Canadian Electrical Code

For USA installations follow the local codes and the national electrical code ANSI/NFPA No. 70.

It is strongly suggested that the wiring of the EB-1 Electrical Junction Box be carried out by a licensed electrician.

Ensure that the power to the supply line has been disconnected before commenc- ing this procedure.

The EB-1 Electrical junction box has been supplied standard on this model to allow for the easy connection of an optional fan kit. (Fig. )

To connect the EB-1 box to the house electrical supply follow the steps below.

1.Remove the front cover of the EB-1 box.

2.Remove the plug socket assembly from the EB-1 box.

3.Feed the supply line in from the outside through the electrical knock-out.

4.Connect the ground wire of the supply line to the green screw of the socket assembly.

5.Connect the white wire of the power line to the chrome screw of the socket assembly.

6.Connect the black wire of the power supply line to the brass screw (polarized) of the socket assembly.

7.Refit the socket assembly back into the electrical box and replace the cover plate.

8.The EB-1 electrical junction box is now ready to supply power to the FK12 or FK24 fan kits, if fitted.

Electrical Box (EB-1)

1¹⁄₂” Gas Inlet Holes

 

FK24 Fan

Retaining

Kit

Mounting

Screw

Studs

 

FP1375

Fig. 6 EB-1 electrical box.

Remote ON/OFF Switch Installation

1.Thread the wiring through the holes on the end panels of the appliance. Take care not to cut the wire or insulation on metal edges. Route the wire to

a conveniently located receptacle box.

2.Attach the wire to the ON/OFF switch and install the switch into the receptacle box.

3.Connect the other ends of the wire to the gas control valve. (Fig. 7)

Remote ON/OFF Switch or Ther- mostat or Remote Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TP

Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TH

 

 

 

 

 

 

 

 

 

 

Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TP

Valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TH

FP1376

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 7 Remote switch wiring diagram.

 

Alternate Switch Location

The remote switch can be installed on the front/side of the access door. Simply mount the switch to the bracket provided and screw the bracket to either side of the frame, lining up the screws with the pre-punched holes. (Fig. 8)

FP1377

Fig. 8 Alternate switch location.

8

10003848

Page 8
Image 8
Vermont Casting DVRTSB manual EB-1Electrical Box, Remote ON/OFF Switch Installation, Alternate Switch Location, 10003848