Vision Fitness ST710 manual Pink BAG

Models: ST710

1 48
Download 48 pages 41.27 Kb
Page 14
Image 14

AB2

AC1

S T E P 4

PINK BAG

• With angled end down and pulley brackets facing weight stack, place the press arm upright (AB2) over the press arm floor support (AC1), aligning the holes in both components. Slide two bolts (M10x62) with flat washers (10.2x22x2) through holes and secure each of the bolts with another flat washer and two nylon nuts (M10).

 

• Take the adjustable handle assembly

 

and slide onto the functional arm upright

AH3

(AH3), making sure the handle is on the

side with the numbers. You will need to

 

 

squeeze the handle to slide over the

 

adjustment holes in the upright. Place the

 

functional arm upright (AH3), numbers

 

facing press arm upright (AB2), over the

 

exposed bolt ends on the functional arm

 

floor support (AC2). Secure the connection

 

with a flat washer (10.2x22x2) and a

AB4

nylon nut (M10) over each bolt end.

• With the hole for the cable on the bottom, place the leg press upright (AB4) over the leg press floor support (AC3). The upright should angle upwards towards the weight stacks. Align the holes in the upright with the center holes in the floor support. Slide two bolts (M10x62) with flat washers (10.2x22x2) through the connection. Secure each of the bolts with another flat washer and a nylon nut (M10).

AC2AC3

14

Page 14
Image 14
Vision Fitness ST710 manual Pink BAG