Vision Fitness ST710 manual Ee Cc

Models: ST710

1 48
Download 48 pages 41.27 Kb
Page 21
Image 21

S T E P 11 CABLE #5

Remove the slotted bolt and nut from the end of the cable. Route this end through the following pulleys in the specified order: Up through the center of the leg press overhead tube, over pulley BB, over CC, down through the center of the tube, under floating pulley DD, over EE, and under the front of FF. Reattach the slotted bolt and nut and thread a minimum of 0.5” into floating pulley AA. Tighten the nut against the receiving post. WARNING: Failure to thread the end in the specified distance can result in serious injur y!

EE CC

BB

AA

DD

FF

21

Page 21
Image 21
Vision Fitness ST710 manual Ee Cc