C24GA SERIES CONVECTION STEAMERS - SERVICE PROCEDURES AND ADJUSTMENTS
16.Turn off the machine.
17.
18.Turn on the machine, let generator fill
19.Observe proper functioning of gas burner.
Operating Pressure Switch
1.Remove the cabinet base front panel as outlined under COVERS AND PANELS. Pressure switch is located behind control box.
2.Turn the power on and let the generator come up to pressure.
3.After the ready light comes on, turn one of the cooking compartment timers on to exhaust steam from the generator.
4.Observe generator pressure gauge reading for several cycles and verify that the burner is cycling off at 3.5 to 4 psi.
Page 15 of 40 |
| F35425 (February 2006) |
|