Frame Assembly

1.Before beginning assembly, make sure you have read and understand the information in the box above.

Locate and open the parts bags labeled ÒFRAME ASSEMBLY BAG ONEÓ and ÒFRAME ASSEMBLY BAG TWO.Ó

Press a 2Ó Square Outer Cap (58) onto the indicated end of the Weight Base (14). Press a 2Ó Square Inner Cap (56) into the indicated end of the Weight Base.

Insert four 5/16Ó x 2 1/2Ó Carriage Bolts (49) up through the Weight Base (14) and place it flat on the floor. Insert four 5/16Ó x 2 1/2Ó Carriage Bolts (49) up through the Press Base (13) and place it on the floor next to the Weight Base.

Attach the Press Base (13) to the Weight Base (14) with two 5/16Ó x 2 3/4Ó Bolts (55), two 5/16Ó Washers

(20)and two 5/16Ó Nylon Locknuts (40). Do not tight- en the Nylon Locknuts yet.

2.Slide the Lat Upright (1) onto the indicated 5/16Ó x

2 1/2Ó Carriage Bolts (49) in the Weight Base (14). Hand tighten two 5/16Ó Nylon Locknuts (40) onto the Carriage Bolts. Do not tighten the Nylon Locknuts yet.

Slide the VKR Upright (51) onto the indicated 5/16Ó x 2 1/2Ó Carriage Bolts (49) in the Weight Base (14). Hand tighten two 5/16Ó Nylon Locknuts (40) onto the Carriage Bolts. Do not tighten the Nylon Locknuts yet.

Slide the Leg Press Upright (4) onto the indicated 5/16Ó x 2 1/2Ó Carriage Bolts (49) in the Press Base

(13).Hand tighten two 5/16Ó Nylon Locknuts (40) onto the Carriage Bolts. Do not tighten the Nylon

Locknuts yet.

5

1

 

 

58

55

20

20

49

14

13

 

 

40

49

 

56

49

2

 

 

51

1

4

 

 

40

 

40

 

49

40

 

14

40

49

49

 

13

Page 5
Image 5
Weider WESY41080 manual Frame Assembly, Locknuts yet