52.Press two 3/4Ó Round Inner Caps (78) into each Pad Tube (28).
Insert a Pad Tube (28) into the Rear Seat Frame (16). Slide a Foam Pad (29) onto each end of the Pad Tube.
Insert the other Pad Tube (28) into the Leg Lever (15). Slide a Foam Pad (29) onto each end of the Pad Tube.
53.Attach a Large Backrest (19) to the Leg Press Upright
(4) with two 1/4Ó x 2 1/2Ó Machine Screws (64) and two 1/4Ó Washers (37).
54.Insert a 1/4Ó x 2 1/2Ó Carriage Bolt (60) through the center hole in a Seat Plate (41). Attach the Seat Plate to the Seat (17) with two 1/4Ó x 1/2Ó Screws (59).
Insert the 1/4Ó x 2 1/2Ó Carriage Bolt (60) through the indicated hole in the Front Seat Frame (8). Tighten a 1/4Ó Nylon Locknut (44) with a 1/4Ó Washer (37) onto the Carriage Bolt.
Attach the other end of the Seat (17) to the Front Seat Frame (8) with a 1/4Ó Washer (37) and a 1/4Ó x 2 1/2Ó Machine Screw (64).
55.Press a 1Ó Round Inner Cap (70) into the holes in the VKR arms located underneath the handles.
Press a 1 1/2Ó Square inner Cap (57) into the end of each VKR Arm (18, 32). Attach a VKR Armrest (71) to the Right VKR Arm (32) with two 1/4Ó x 2Ó Machine Screws (63) and two 1/4Ó Flat Washers (37).
Attach a VKR Armrest (71) to the Left VKR Arm (18) in the same manner.
52 |
| |
78 | 16 | |
| ||
29 |
| |
| 28 | |
15 | 29 | |
78 | ||
| ||
53 | 4 | |
| ||
64 | 19 | |
37 |
54 |
|
|
|
| 17 |
| 41 | 60 |
|
| |
|
| 59 |
| 37 | 8 |
|
| |
| 64 |
|
|
| 44 |
55 | 57 |
|
|
| |
| 70 |
|
|
| 57 |
71 | 71 |
|
18 |
| 70 |
|
| |
32 |
| 37 |
| 37 | 63 |
21