50.Wrap the Low Cable (86) around a 3 1/2Ó Pulley (82) in the direction shown. Attach the Pulley and two Pulley Covers (94) to the welded tube on the Ab Upright (1) with a 3/8Ó x 3 3/4Ó Bolt (76), a 3/8Ó Washer (38) and a 3/8Ó Nylon Locknut (42). Orient the wide tab on the Pulley Covers as shown.

51.Wrap the Low Cable (86) around a 3 1/2Ó Pulley (82) in the direction shown. Attach the Pulley and two Pulley Covers (94) to the lower set of holes in the Pulley Plates (31) with a 3/8Ó x 2 1/4Ó Bolt (99) and a 3/8Ó Nylon Locknut (42). Orient the wide tab on the

Pulley Covers as shown.

50

 

 

1

94

 

42

86

 

Welded Tube

38

 

 

82

Wide Tab

94

76

 

51

 

 

31

 

42

 

99

Wide Tab

94

52.Wrap the Low Cable (86) around a 3 1/2Ó Pulley (82) in the direction shown. Attach the Pulley and two Pulley Covers (94) to the indicated hole in the Ab Upright (1) with a 3/8Ó x 3 3/4Ó Bolt (76), two 3/8Ó Washers (38) and a 3/8Ó Nylon Locknut (42). Orient the wide tab on the Pulley Covers as shown.

86

52

94

82

1

42

94

38

Wide

Tab 82 38 76

86

19

Page 19
Image 19
Weider WESY93190 manual Welded Tube