FRAME ASSEMBLY

1.Before beginning assembly, be sure that you have read and understand the information in the box above.

Locate and open the parts bags labeled ÒFRAME ASSEMBLY BAG ONEÓ and ÒFRAME ASSEMBLY BAG TWO.Ó

Press two 2Ó Square Outer Caps (58) onto the indi- cated ends of the Weight Base (14). Press a 2Ó Square Inner Cap (56) into the end of the Weight Base.

Insert four 5/16Ó x 2 1/2Ó Carriage Bolts (49) up through the Weight Base (14).

Insert four 5/16Ó x 2 1/2Ó Carriage Bolts (49) up through the Press Base (13).

Attach the Press Base (13) to the Weight Base (14) with two 5/16Ó x 2 3/4Ó Bolts (55), two 5/16Ó Washers

(20)and two 5/16Ó Nylon Locknuts (40). Do not tight- en the Nylon Locknuts yet.

2.Slide the Ab Upright (1) onto the indicated

5/16Ó x 2 1/2Ó Carriage Bolts (49) in the Weight Base

(14).Hand tighten two 5/16Ó Nylon Locknuts (40) onto the Carriage Bolts. Do not tighten the Nylon

Locknuts yet.

Slide the Leg Press Upright (4) onto the indicated 5/16Ó x 2 1/2Ó Carriage Bolts (49) in the Press Base

(13).Hand tighten two 5/16Ó Nylon Locknuts (40) onto the Carriage Bolts. Do not tighten the Nylon

Locknuts yet.

5

1

 

 

 

58

58

 

20

 

55

55

 

 

 

20

 

14

 

 

 

49

 

 

 

13

49

 

 

56

40

 

 

 

 

49

 

2

 

 

1

4

 

 

 

40

 

40

 

 

 

14

13

 

 

49

49

 

Page 5
Image 5
Weider WESY93190 manual Frame Assembly, Locknuts yet