PLUS LINE
B gas
Gas-fired boiler applications
Overview
Follow the guidelines in this section to install
B1. Install system water piping |
| ||
| System water piping methods | 25 | |
| Boiler circulator | 25 | |
| Sizing space heating system piping | 25 | |
| Zoning with zone valves | 26 | |
| Zoning with circulators | 27 | |
| Combined space heating/water heating applications | 28 | |
| Dedicated water | 28 | |
B2. Install |
| ||
| Combined space heating/water heating applications | 28 | |
| Dedicated water | 28 | |
B3. | Field wiring — |
| |
| Installation must comply with: | 30 | |
| Line voltage connections | 30 | |
| Wiring boiler circulator | 30 | |
| Wiring PLUS circulator | 30 | |
| Wiring a system circulator | 31 | |
| Routing line voltage wiring | 31 | |
| Low voltage connections | 31 | |
| Room thermostat (space heating) | 31 | |
| Outdoor temperature sensor | 31 | |
| PLUS water heater thermostat | 31 | |
| Additional limits | 31 | |
B4. |
| ||
| Follow boiler manual | 33 | |
| Set space heating operation | 33 | |
| Water heater operation | 33 | |
| Water heater operation setup | 33 | |
| Verify space heating operation | 33 | |
| Verify water heater operation | 34 | |
| Operating information | 34 | |
| Replace boiler jacket front door | 34 |
24 | Part Number |