Assembly Instructions Cont’d
PREPARE MOWER
Install Discharge Chute
1.Position discharge chute (2) over stud (5) on mower frame (1).
2.Install carriage bolts (3) (attached to discharge chute assembly) and secure with nuts (4).
3.Install knob (6) on stud (5).
1.Mower frame
2.Discharge chute
3.3/8 x
4.3/8" Nut
5.3/8" Stud
6.3/8" Knob
5
6
4
1
3
LA3
2
Figure 29 Discharge Chute Installation
Install Mounting Channel & Lift Bar
NOTE: 7000, 7200 and 7205 tractors use alternate front channel (1A).
1.Insert sleeve (5) into front mounting channel (1). Place washer (6) on bolt (7) and insert through sleeve
(5) and front lift bracket (2).
2.Slide second sleeve (5) over bolt (7) and install front mower lift bar (3). Secure with flanged locknut
(4).
3.Repeat this procedure for opposite side of front mounting channel.
1.7192, 7194, & 7195 Front mount channel
1A. 7000, 7200, & 7205 Front mount channel
2 Front lift bracket
3.Front mower lift bar, 6.5"
4.1/2" Flanged locknut
5.1/2 x 3/4 x 1/2" Sleeve
6.1/2" Flat washer
7.1/2 x 2" Bolt
| 3 |
| 5 |
| 6 |
| 7 |
1 | 4 |
| 2 |
| 5 |
DB3406A | 1A |
|
Figure 30 Front Channel Installation
36 Assembly | MAN0137 (9/14/01) |
|