Woods Equipment 7000, 7192, 7194, 7195, 7200, 7205 manual Assembly, Pre-Delivery Check List

Models: 7000, 7192, 7194, 7195, 7200, 7205

1 50
Download 50 pages 29.52 Kb
Page 44
Image 44
PRE-DELIVERY CHECK LIST

Assembly Instructions Cont’d

PRE-DELIVERY CHECK LIST

(DEALER’S RESPONSIBILITY)

Inspect the equipment thoroughly after assembly to make sure it is set up properly before delivering it to the customer. The following check list is a reminder of points to inspect. Check off each item as it is found satisfactory, corrections are made, or services are performed.

___ Check all bolts to be sure they are properly torqued.

___ Check that all cotter pins and safety pins are properly installed. Replace if damaged.

___ Check and grease all lubrication points as iden- tified in “Service, lubrication information

___ Check the level of gearbox fluids before deliv- ery. Service, if required, as specified in the “Ser- vice, lubrication information.”

___ Check that blades have been properly installed.

DELIVERY CHECK LIST

(DEALER’S RESPONSIBILITY)

___ Show customer how to make adjustments and select proper PTO speed.

___ Check mower attitude and belt alignment.

___ Instruct customer how to lubricate and explain importance of lubrication.

___ Point out the safety decals. Explain their mean- ing and the need to keep them in place and in good condition. Emphasize the increased safety hazards when instructions are not followed.

___ Point out all guards and shields. Explain their importance and the safety hazards that exist when not kept in place and in good condition.

___ Present Operator's Manual and request that customer and all operators read it before oper- ating equipment. Point out the manual safety rules, explain their meanings and emphasize the increased safety hazards that exist when safety rules are not followed.

___ Explain to customer that when equipment is transported on a road or highway, a Slow Mov- ing Vehicle (SMV) sign should be used to pro- vide adequate warning to operators of other vehicles.

42 Assembly

MAN0137 (9/14/01)

 

Page 44
Image 44
Woods Equipment 7000, 7192, 7194, 7195, 7200, 7205 manual Pre-Delivery Check List, Assembly Instructions Cont’d