E

EJU01060

Switches

Check the start switch 1, the engine stop switch 2, and the engine shut-off switch 3 for proper operation.

To check these switches place the water- craft in the water to provide adequate cooling. Start the engine, and then pull the engine shut-off cord 5 to remove the clip 4 from the engine shut-off switch. Verify that the engine stops immediately. (See pages 3-16 to 3-19 for information on proper operation of the start switch, the engine stop switch and the engine shut-off switch.)

EJU01061

Cooling water pilot outlet

Check that water comes out from the outlets while the engine is running and the watercraft is in the water.

EJU01246

Multifunction meter

Check the operation of the multifunction meter. (See pages 2-18 to 2-26 for operation of the meter.)

3-13