Yeoman PR1145 instruction manual Fuel BED Arrangement

Models: PR1145

1 23
Download 23 pages 57.5 Kb
Page 12
Image 12

INSTALLATION INSTRUCTIONS

INSTALLATION

3.5Check the pull of the flue system by applying a lighted smoke pellet to the flue system opening. If there is a definite flow into the chimney, proceed with the installation, if not warm the chimney for a few minutes.

IF THERE IS STILL NO DEFINITE FLOW, THE FLUE MAY REQUIRE ATTENTION - SEEK EXPERT ADVICE.

3.6The flue system may now be connected to the stove, ensure that all joints are sealed with a suitable fire resistant sealant. It is also recommended that a physical retention method be used at the flue spigot joint, self-tapping screws being favoured.

3.7Connect a suitable pressure gauge to the test point located on the inlet fitting, and turn the gas supply on. Light the appliance and check all gas joints for gas soundness. Turn the appliance to maximum and check that the supply pressure is as stated on the data badge. Turn the gas off and replace the test point screw, turn the gas on and check the test point for gas soundness.

4. FUEL BED ARRANGEMENT

Advice on Handling and Disposal of Fire Ceramics

4.1The fuel effect logs and embers in this stove are made from Refractory Ceramic Fibre (RCF). Protective clothing is not required when handling these articles, but we recommend you follow normal hygiene rules of not smoking, eating or drinking in the work area and always wash your hands before eating or drinking. Excessive exposure to these materials may cause temporary irritation to eyes, skin and respiratory tract; wash hands thoroughly after handling the material.

4.2To ensure that the release of RCF fibres is kept to a minimum a HEPA filtered vacuum is recommended to remove any dust accumulated in and around the stove.

4.3When servicing the stove it is recommended that the replaced items are not broken up, but are sealed into heavy duty polythene bags and labelled as RCF waste. RCF waste is classed as stable, non-reactive, hazardous waste and may be disposed of at a licensed landfill site.

4.4Turn and pull right hand rose to open door (see Diagram 5).

5

Turn rose to

open door

AR2378

4.5Remove the glass frame by undoing the 6 x frame fixing screws and lifting clear (see Diagram 6).

6

AR1909

4.6Place the flame baffle onto the burner and push up against the rear tray lip (see Diagram 7).

7

AR0359

4.7Locate the rear panel against the spacer brackets and slide down so that it locates on the ledge of the flame baffle (see Diagram 8).

12

Page 12
Image 12
Yeoman PR1145 instruction manual Fuel BED Arrangement