Before lifting, make sure the unit weight is distrib- uted equally on the rigging cables so it will lift evenly.
Units may be moved or lifted with a forklift. Slotted openings in the base rails are provided for this purpose.
LENGTH OF FORKS MUST BE A MINIMUM OF 60 INCHES.
All panels must be secured in place when the unit is lifted.
The condenser coils should be protected from rig- ging cable damage with plywood or other suitable material.
TABLE 4: 6 POINT LOAD WEIGHT
Model |
|
| Location (lbs.)* |
|
| |
| A | B | C | D | E | F |
|
|
|
|
|
|
|
DM090 | 158 | 142 | 128 | 187 | 207 | 230 |
DM120 | 168 | 151 | 136 | 198 | 219 | 244 |
|
|
|
|
|
|
|
DM150 | 180 | 161 | 145 | 212 | 235 | 262 |
*. Weights include largest gas heat option.
TABLE 5: 4 POINT LOAD WEIGHT
Model |
| Location (lbs.)* |
| |
| A | B | C | D |
|
|
|
|
|
DM090 | 230 | 197 | 287 | 336 |
DM120 | 245 | 209 | 305 | 357 |
|
|
|
|
|
DM150 | 262 | 224 | 327 | 382 |
*. Weights include largest gas heat option.
|
| FRONT |
LEFT | B | C |
|
LEFT
A
FRONT
CD
B
E
F
A
D
FIGURE 5 - UNIT 4 POINT LOAD
TABLE 3: | UNIT WEIGHTS |
|
Model | Shipping Weight* (lb.) | Operating Weight† (lb.) |
DM090 | 1056 | 1051 |
|
|
|
DM120 | 1121 | 1116 |
|
|
|
DM150 | 1200 | 1195 |
|
|
|
Econ. | 85 | 84 |
|
|
|
w/ PE | 150 | 148 |
|
|
|
Elec. Heat2 | 49 | 49 |
*. Weights include largest gas heat option.
†.54kW heater.
FIGURE 6 - UNIT 6 POINT LOAD
LEFT47-1/2" 25-1/2"FRONT
FIGURE 7 - UNIT CENTER OF GRAVITY CLEARANCES
All units require particular clearances for proper operation and service. Installer must make provisions for adequate ventilation air in accordance with applicable provisions of the local building codes. Refer to Table 6 for clearances required for combustible construction, servicing, and proper unit oper- ation.
12 | Unitary Products Group |