Yukon Advanced Optics Oil Furnace owner manual Gas Firing the Unit, Operating Instructions, Fig

Models: Oil Furnace

1 64
Download 64 pages 37.66 Kb
Page 32
Image 32
Gas Firing the Unit

Operating Instructions

Gas Firing the Unit

To Start the Gas burner on new installation

1.With gas line in “off” position, install burner using gasket and tighten down with 3 nuts to furnace.

2.Connect 110 Volt power to burner

3.Connect 24 Volt power to the burner from the DS-103 Ver- satrol.

4.Set room thermostat 10 degrees above room temperature.

5.Allow burner to operate for 2 minutes until all air is purged from gas line.

6.Adjust burner air to allow red flame to enter wood combus- tion chamber about 6 inches.

7.Set the draft regulator on the chimney to .03” Water Col- umn negative to the chimney with burner operating at least 5 minutes.

8.Gas burner air should be adjusted with CO-2 meter to in- sure maximum burner efficiency.

9.Refer to burner manual for service tips.

FIG. 30

WAYNE MODEL P250 GAS BURNER

32

Page 32
Image 32
Yukon Advanced Optics Oil Furnace Gas Firing the Unit, Operating Instructions, To Start the Gas burner on new installation