CLEARANCES TO COMBUSTIBLES

Plan Your Installation

CLEARANCES TO COMBUSTIBLES

ABOVE TOP OF

FROM THE

FROM SIDES

FROM CHIMNEY

6 FT OF

6 FT OF

WARM AIR PLENUM

FRONT

AND BACK

CONNECTOR

PLENUM

PLENUM

 

 

 

 

 

 

6”

48”

18” *

18”

6”

1”

 

 

 

 

 

 

Floor Joist or Combustible Material

! CAUTION !

BE SURE TO INSTALL DUCT WORK

WITH CLEARANCES SHOWN

6 Inches

WARM AIR

PLENUM

FURNACE

6 Feet

BE SURE TO INSTALL DUCT WORK 1”

Heat Supply

Ducts

1” CLEARANCE TO COMBUSTIBLES BEYOND 6’ TO A POINT WHERE THERE IS A CHANGE IN DIRECTION OF

90 DEGREES OR MORE.

8” Dia.

18” WITH CLEARANCES SHOWNMIN

Combustible

NOTE:

DUCT AND PLENUMS SHALL BE CONSTRUCTED ENTIRELY OF

Flue Pipe

Top View

Cold Air

Plenum

Top View

Warm Air

Plenum

Walls Manual background

Manual background 18” MIN Manual background

SHEET METAL.

*Up to 50% less clearance between combus- tible walls and chimney connector to furnace and ducts is allowed if insulated according to NFPA Standard 90B or your local building code. This copyrighted book is available from the National Fire Protection Association, Inc., PO Box 9101, Quincy, MA 02269-9101

SERVICE CLEARANCE OF 24 INCHES MINIMUM REQUIRED TO SERVICE BLOWER

FIG. 4

FLOOR TO BE NON-COMBUSTIBLE MATERIAL

12

 

Page 12
Image 12
Yukon Advanced Optics Oil Furnace Clearances To Combustibles, Be Sure To Install Duct Work, With Clearances Shown