Roberts Gorden BH-60, BH-40, BH-150, BH-175, BH-115, BH-100, BH-140, BH-200, BH-80 Burner Installation

Page 30

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.6 Burner Installation

Extra chain min.

12" (30 cm)

 

Burner

Gasket

 

 

 

 

 

 

 

Lock

 

 

 

 

Washer

 

 

 

 

Description

 

Part Number

 

Bolt

 

94273914

 

 

 

 

 

Burner

 

071XXXXX

 

 

 

 

 

Lock Washer

 

96411600

 

 

 

 

 

Gasket

 

02568200

 

 

 

 

 

 

S-hook

Burner Tube

Bolt (Torque 120 13.56 Nm)

24 of 59

Image 30
Contents Economical Unitary Page Roberts-Gordon LLC Page Table of Figures Page Safety Labels and Their Placement Heater SafetyManpower Requirements California PropositionTop and Bottom Panel Label Placement DescriptionSide and Back Panel Label Placement Description Part NumberInstaller Responsibility Wall TagNational Standards and Applicable Codes Maintain clearances to combustibles at all times for safety Clearances are the required distances thatInches C DCentimeters 45 Tilt Reflector Model Tube, Standard Reflector ModelTube, Opposite 45 Reflector Model Inches CentimetersUnvented VentedNational Standards and Applicable Codes Burner Tube Major ComponentsStainless Steel Reflector End CapStandard Parts List Contents of BH-Series Burner CartonCore Packages Minimum Standard Aluminized Heater Installation Critical Hanger Placement Run Length Typical ExpansionLinear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Linear Heater Layout OverviewTube Clamp Package Installation Coupling and Tube AssemblyTube Clamp Package Tube Length 1 Coupling and Tube Assembly2 Coupling and Tube Assembly ModelTurbulator Installation Turbulator InstallationHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Elbow Package Configuration .2.1 Elbow InstallationBetween Burner and Elbow Clip Package2 Elbow Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector InstallationDescription Part Number Lower Clearance Shield Package 2 Frame Shield Installation Distance a ExtensionDescription Part Number Reflector Side Extension 01370412 2 Grille End Cap Installation 3 Grille InstallationVenting United States RequirementsCanadian Requirements Vertical Venting Unvented OperationHorizontal Venting Unvented Operation Tube TerminationVertical Ventilation 4 10 cm Pipe Common Side Wall VentingCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplyDescription Part Number Vent Cap 4 10 cm 90502300 Vertical Outside Air Supply for Double Heater Installation Description Part Number Vent Cap 6 15 cm 90502302GAS Piping Hold gas nipple securely with pipe wrench When attaching gas hoseCorrect Positions Failure to follow these instructions can resultWiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the Burner Sequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterObjects Vicinity of the HeaterVehicles and Other ReflectorMotor Burner Cup and Orifice Safety LabelsBlower Scroll, Wheel ElectrodeTroubleshooting Troubleshooting Flow Chart YESPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionPage ROBERTS-GORDON LLC will not PAY for Warranty is Void ifROBERTS-GORDON LLC will PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 23.9 Kb Manual 20 pages 37.5 Kb