Roberts Gorden BH-115, BH-60, BH-40, BH-150 Tube, Opposite 45 Reflector Model, Inches Centimeters

Page 14

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

NOTE: 1. All dimensions are from the surfaces of all tubes, couplings and elbows.

2.Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.

FIGURE 9: U-Tube, Opposite 45° Reflector

B

A

C D

Model

BH-40

BH-60

BH-80

BH-100

BH-115/125 BH-140/150 BH-175/200

(inches)

A B C D

- UNAPPROVED -

8

54

59

22

8

60

65

22

10

64

73

22

10

70

77

22

12

74

83

22

12

76

85

22

(centimeters)

A B C D

- UNAPPROVED -

21

138

150

56

21

153

166

56

26

163

186

56

26

178

196

56

31

188

211

56

31

194

216

56

FIGURE 10: 2-Foot Deco Grille and Protective Grille

 

 

 

 

 

 

 

 

 

 

 

 

(inches)

 

 

(centimeters)

 

 

 

 

Model

A

B

C

D

A

B

C

D

 

 

A

BH-40

6

27

52

27

16

69

133

69

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BH-60

6

35

62

35

16

89

158

89

 

 

C

BH-80

6

38

65

38

16

97

166

97

 

 

BH-100

6

40

70

40

16

102

178

102

 

 

 

B

D

 

BH-115/125

6

46

76

46

16

117

194

117

 

 

 

 

 

 

BH-140/150

6

50

79

50

16

127

201

127

 

 

 

BH-175/200

8

52

82

52

21

133

209

133

FIGURE 11: Lower Clearance Shield*

 

 

 

 

 

 

 

 

 

 

 

 

 

(inches)

 

 

(centimeters)

 

 

 

 

 

 

 

 

 

 

 

 

Model

A

B

C

D

A

B

C

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

BH-40

6

34

27

34

16

87

69

87

 

 

 

 

 

 

 

 

 

 

 

BH-60

6

39

33

39

16

100

84

100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BH-80

6

40

38

40

16

102

97

102

 

 

 

 

 

 

 

 

 

C

 

 

 

B

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BH-100

6

50

44

50

16

127

112

127

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BH-115/125

6

54

48

54

16

138

122

138

 

 

 

 

 

 

 

 

 

 

 

BH-140/150

6

55

50

55

16

140

127

140

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BH-175/200

 

- UNAPPROVED -

 

 

- UNAPPROVED -

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*When installed in the first 10' (3 m).

8 of 59

Image 14
Contents Economical Unitary Page Roberts-Gordon LLC Page Table of Figures Page Safety Labels and Their Placement Heater SafetyManpower Requirements California PropositionTop and Bottom Panel Label Placement DescriptionSide and Back Panel Label Placement Description Part NumberNational Standards and Applicable Codes Installer ResponsibilityWall Tag Maintain clearances to combustibles at all times for safety Clearances are the required distances thatCentimeters InchesC D 45 Tilt Reflector Model Tube, Standard Reflector ModelTube, Opposite 45 Reflector Model Inches CentimetersUnvented VentedNational Standards and Applicable Codes Burner Tube Major ComponentsStainless Steel Reflector End CapStandard Parts List Contents of BH-Series Burner CartonCore Packages Minimum Standard Aluminized Heater Installation Critical Hanger Placement Run Length Typical ExpansionLinear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Linear Heater Layout OverviewTube Clamp Package Tube Clamp Package InstallationCoupling and Tube Assembly Tube Length 1 Coupling and Tube Assembly2 Coupling and Tube Assembly ModelTurbulator Installation Turbulator InstallationHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Elbow Package Configuration .2.1 Elbow InstallationBetween Burner and Elbow Clip Package2 Elbow Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector InstallationDescription Part Number Lower Clearance Shield Package Description Part Number Reflector Side Extension 01370412 2 Frame Shield InstallationDistance a Extension 2 Grille End Cap Installation 3 Grille InstallationCanadian Requirements VentingUnited States Requirements Vertical Venting Unvented OperationHorizontal Venting Unvented Operation Tube TerminationVertical Ventilation 4 10 cm Pipe Common Side Wall VentingCommon Vertical Venting Description Part Number Vent Cap 4 10 cm 90502300 Vertical Outside Air Supply for Single Heater InstallationOutside Combustion Air Supply Vertical Outside Air Supply for Double Heater Installation Description Part Number Vent Cap 6 15 cm 90502302GAS Piping Hold gas nipple securely with pipe wrench When attaching gas hoseCorrect Positions Failure to follow these instructions can resultWiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the Burner Sequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterObjects Vicinity of the HeaterVehicles and Other ReflectorMotor Burner Cup and Orifice Safety LabelsBlower Scroll, Wheel ElectrodeTroubleshooting Troubleshooting Flow Chart YESPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionPage ROBERTS-GORDON LLC will not PAY for Warranty is Void ifROBERTS-GORDON LLC will PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 23.9 Kb Manual 20 pages 37.5 Kb